Cabinet or container —
which fits your site?
Both store the same energy. The right form factor depends on your space, your power demand and how quickly the site must be live.
Where cabinets win
All-in-one cabinets integrate cells, PCS, BMS and thermal management in a single enclosure. They arrive pre-commissioned, need a small footprint and can be placed close to the load. For a factory needing 125-250 kW and a few hundred kWh, a cabinet is usually faster to install and simpler to permit. Our 261 kWh, 418 kWh and 488 kWh models sit in this category.
Where containers win
Containerised systems make sense when the project moves into the megawatt-hour range or when many racks must be serviced independently. A 20-foot or 40-foot layout allows more capacity, more maintenance space and easier staging of spare parts. The trade-off is a larger pad, longer cable runs and more civil work.
Transport and access constraints
Check the route before choosing. A container needs crane access and a wide gate; a cabinet can often be offloaded with a forklift and rolled into place. Narrow industrial sites, low gate heights and internal roads with tight corners frequently decide the form factor more than the energy requirement does.
Expansion strategy
Cabinets parallel neatly — adding a second unit is often the simplest way to double capacity. Containers can also be expanded, but busbar and protection coordination must be planned from the start. Whichever you choose, design the electrical room, cable routes and physical space for phase two before phase one is installed.
Frequently asked questions
- Can a cabinet reach 1 MWh?
By paralleling multiple cabinets, yes. Beyond a few units, a container often becomes more economical in civil and cabling terms.
- Which is faster to install?
Cabinets, in most cases. They arrive factory-tested and need minimal on-site assembly.
- Does a container need a fire wall?
Depends on local code and capacity. Involve the fire authority early with the site plan.
Not sure which fits?
Send your site's available space, access route and required power. We will recommend a cabinet or container configuration with the reasoning.